Installation Instructions: Trellis

Step 1

Determine the position

First determine the position of the trellis on the wall. Press the trellis grid against the wall and mark the positions for the screws on the wall using the screw holes of the trellis grid.

Step 2

Drill holes

Drill the holes at the previously marked marks. Clean the bore holes from dust.

Step 3

Screw the trellis to the wall

Insert the dowels into the holes. Trellis is attached flush to the wall with the drill holes positioned. Trellis with the supplied M8 spanner screws and washers to the wall.

 

Installation instructions PDF

Sorry, item "insert-global-ansprechpartner-baumschutz-en-2" does not exist.

Installation Instruction for Trellis

©2026 HYDROTEC Technologies AG

Settings saved

Privacy settings

Manhole covers & Gully tops

Drainage Channels

Surface Boxes

Gardening & Landscaping